Home, TBM, Rolling Stock, Tunnel Equipment | Tunnel Saz Machine

OUR MISSION IS BEING WITH YOU TILL BREAK THROUGH

Disassembly of the TBM Machine Project Nosud Project (B) 2

 

TunnelSazMachine Company Activities:



• Disassembly Backup
• Transfer back up of the tunnel
• Dismantling shields in caves built inside the tunnel
• Transfer shields dumped to the outside of the tunnel

  • Device size :

    Diameter of the device: 6.125 meters
  • device type :

    Hard Rock Double Sheild
  • Manufacturer :

    SELI
  • Year of construction :

  • Other technical specifications :

  • Country, city :

    Iran, Kermanshah
  • Year of construction :

    2017
  • Stock :

    Transferring Water
  • Geology :

  • Mechanical data :

  • Client :

    Iran Water and Power Resources Development Co.
  • Description :