Nosud Water Transfer Project, Part (B) 2

 

TunnelSazMachine Company Activities:


• Dismantling, overhauling and rebuilding the machine for drilling in ambient conditions. Exposure to water and gas
• Assembly and installation of the device
• 4.5 km long excavation with negative slope in environmental and water conditions
• Supply, installation of a tunnel conveyor system
• TBM overhaul at 2.700 meters due to water influx
• Overhaul of the TBM machine at an area of 3,900 due to the influx of water and Project

  • Device size :

    Diameter of the device: 6.125 meters
  • device type :

    Hard Rock Double Shield
  • Manufacturer :

    ُSelli
  • Year of construction :

  • Other technical specifications :

  • Country, city :

    Iran, Kermanshah
  • Year of construction :

    2013
  • Stock :

    Transferring Water
  • Geology :

  • Mechanical data :

    Tunnel length: 26 km