Home, TBM, Rolling Stock, Tunnel Equipment | Tunnel Saz Machine

OUR MISSION IS BEING WITH YOU TILL BREAK THROUGH

Pipeline Operation Project on Fatah Highway

 


TunnelSazMachine Company Activities:


• Supplying the device
• Complete reconstruction and overhaul of the device
• Performing a 2500-meter long pipeline operation



About Project:



Plan of the removing dewatering point in Fatah Highway, includes implementation of 80 meters pipeline by Pipe Jacking method in the downhill route of this highway and 200 meters piping by Open Trench method.

With the implementation of the mentioned project, the surface water of the Fatah highway will be shifted from the Kafshe Melli Bridge to the Karvansara Sangi Bridge, by moving the pipeline to the south side of the highway, and from there also to the canals which is located within the city of Qods, after the Rah Ahan Bridge. The aim of this project is to improve the status of the project to collect surface water of the region and to improve the level of services to the citizens and increase their satisfaction.

  • Device size :

    1980 mm
  • device type :

    Micro TBM AVN 1600 , Sularry - Full Face
  • Manufacturer :

    Herrenknecht
  • Year of construction :

  • Other technical specifications :

  • Country, city :

    Iran, Tehran
  • Year of construction :

    2017
  • Stock :

    Transferring Water
  • Geology :

  • Mechanical data :

  • Client :

    KhakRiz Ab Co- Consultant: Ray AB Company
  • Description :