Home, TBM, Rolling Stock, Tunnel Equipment | Tunnel Saz Machine

OUR MISSION IS BEING WITH YOU TILL BREAK THROUGH

The main drive of the TBM machine project is Tehran Metro Line 7

 

TunnelSazMachine Company Activities:


• Full Main drive restoration including as below:
• Disassembly Full Bearing Main Device
• Fixing the original Bearing defects of the machine
• Completely disassembly the Sealing Mine Drive system
• Completely disassemblyof gearbox and hydromotor drives
• Gear and penion testing
• Complete Drive Assembly
• Mining drive rotation test

  • Device size :

    Diameter of the device: 9.4 meters
  • device type :

    SELI - LOVAT
  • Manufacturer :

    EPB
  • Year of construction :

    2017
  • Other technical specifications :

  • Country, city :

    Iran, Tehran
  • Year of construction :

    2017
  • Stock :

    Metro
  • Geology :

  • Mechanical data :

  • Client :

  • Description :