Contact Us






    OUR MISSION IS BEING WITH YOU TILL BREAK THROUGH
    Country, city : Iran, Kermanshah
    Year of construction :
    Stock : Water Transfer
    Geology :
    Mechanical data : Tunnel length: 14 Km
    Client : Ab Nirou
    Description :
    Device size : Device Diameter: 5.275 m
    device type : Hard Rock Double Shield
    Manufacturer : Herrenknecht
    Year of construction : 2008
    Other technical specifications :
    TunnelSazMachine Company Activities

    • A complete overhaul of the second-handpurchased TBM machine
    • Assembly and installation of devices
    • Supervisor drilling operations for 200 m tunnel length
    • Periodic reviews and technical reports during 14 km drilling