Contact Us






    OUR MISSION IS BEING WITH YOU TILL BREAK THROUGH
    Country, city : Seri Lanka
    Year of construction : 2013
    Stock : Water Transfer for water Power Plant
    Geology :
    Mechanical data : Tunnel length: 3.5 km
    Client : Farab Co
    Description : Contractor: Ktb Consulting - Consultant: MahabGhodss
    Device size : Diameter: 4.2 meters
    device type : Hard Rock Double Shield
    Manufacturer : Herrenknecht
    Year of construction : 2012
    Other technical specifications :
    TunnelSazMachine Company Activities
    • Provide shear tools required by the project as a package
    • Monitoring device navigation throughout the project
    • Monitoringthe shearing tools during the project
    • Procurement of spare parts for the project