    Location Sri Lanka
    Year of Execution 2013
    Stock Water transfer for water power plant
    Geology
    Mechanical data Tunnel length: 3.5 km
    Client Farab Co.
    Description : Contractor: Ktb Consulting - Consultant: MahabGhodss
    Diameter 4.2 meters
    Type Hard Rock Double Shield
    Manufactured By Herrenknecht, Germany
    Year of Manufacturing 2012
    Other technical specifications :
    TSM’s Scope of Activities and Project Portfolio

    Scope:

      • Procured and supplied cutting tools as a complete package for the TBM.
      • Supervised tool performance monitoring, maintenance, and spare parts procurement.
      • Collaborated with client Farab Co., contractor KTB, and consultant Mahab Ghods.