Contact Us






    OUR MISSION IS BEING WITH YOU TILL BREAK THROUGH
    Country, City: Iran, Shiraz
    Year: 2023-2024
    Type: subway (Metro)
    Client: Shams Omran
    Progress: Finished
    Name: S280
    Type: EPB TBM
    Manufacturer: Herrenknecht
    TunnelSazMachine Company Activities

    •⁠  ⁠refurbishment, assembly and drilling of 300 meters with TBM 9.36m in diameter.

    Project Description

    Shiraz subway line 3 project includes the refurbishment and assembly of HK EPB-TBM and implementation of 300 meters drilling by using the technology of EPB machines, that has been designed and built by Herrenknecht Company.

    The machine has a drilling diameter of 6.88 m and is a EPB type. The Back-up has modified for tunnel conveyor system and a cross belt is designed and installed for this purpose.