The Shiraz Metro Line 3 project has achieved a major milestone with the successful breakthrough of the Tunnel Boring Machine (TBM) at Afarinesh (F3) Station. This significant achievement represents a crucial advancement in the expansion and development of Shiraz metro infrastructure, bringing the city one step closer to a more efficient and modern urban transit system.
Tunnel Saz Machine Key Role The project involved the refurbishment and assembly of a Herrenknecht (HK) EPB-TBM with a diameter of 9.36 meters, along with the completion of 1800 meters of tunneling using advanced methods to ensure efficiency and safety in the excavation process. As a key partner, Tunnel Saz Machine proudly contributed its expertise in TBM refurbishment, assembly, and tunneling operations, playing a crucial role in ensuring the smooth operation of the TBM. This achievement reflects the company’s commitment to infrastructure development and large-scale tunneling projects. Tunnel Saz Machine looks forward to future collaborations that will drive progress in urban transit solutions. we Congratulat the entire team on this remarkable achievement!