The installation and commissioning of the Auger Boring machine for the main sewage line project in Baghdad have been successfully completed.
The project is being implemented using trenchless technology, enabling the installation of the sewer line without open excavation. This approach enhances construction accuracy, improves safety, and significantly reduces disruption to urban traffic and surrounding areas.
With a total length of approximately 2,700 meters, the sewage line represents a vital component of Baghdad’s urban infrastructure, providing essential services to several critical and public facilities across the city.
The mechanized auger boring operations are being executed by TSM’s specialized technical team, ensuring high construction accuracy, enhanced safety standards, and minimal disruption to urban traffic, in line with modern engineering practices.