Contact Us






    OUR MISSION IS BEING WITH YOU TILL BREAK THROUGH
    Country, city : Iran, Kermanshah
    Year of construction : 2017
    Stock : Transferring Water
    Geology :
    Mechanical data :
    Client : Iran Water and Power Resources Development Co.
    Description :
    Device size : Diameter of the device: 6.125 meters
    device type : Hard Rock Double Sheild
    Manufacturer : SELI
    Year of construction :
    Other technical specifications :
    TunnelSazMachine Company Activities

    • Disassembly Backup
    • Transfer back up of the tunnel
    • Dismantling shields in caves built inside the tunnel
    • Transfer shields dumped to the outside of the tunnel